{"id":39766,"date":"2014-02-15T12:42:17","date_gmt":"2014-02-15T07:42:17","guid":{"rendered":"http:\/\/pamirtimes.net\/?p=39766"},"modified":"2014-02-15T15:09:56","modified_gmt":"2014-02-15T10:09:56","slug":"gojal-bridge-scandal-contractor-paid-says-ac-hunza","status":"publish","type":"post","link":"https:\/\/pamirtimes.net\/tg\/2014\/02\/15\/gojal-bridge-scandal-contractor-paid-says-ac-hunza\/","title":{"rendered":"Gojal Bridge Scandal: Contractor not to be paid, says AC Hunza"},"content":{"rendered":"<figure id=\"attachment_39767\" aria-describedby=\"caption-attachment-39767\" style=\"width: 534px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-39767\" alt=\"Tehsildar Gojal Alam Khan briefing the Assistant Commissioner near the site of the collapsed bridge \" src=\"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg?resize=534%2C330\" width=\"534\" height=\"330\" srcset=\"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg?w=534&amp;ssl=1 534w, https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg?resize=450%2C278&amp;ssl=1 450w\" sizes=\"auto, (max-width: 534px) 100vw, 534px\" \/><\/a><figcaption id=\"caption-attachment-39767\" class=\"wp-caption-text\">Tehsildar Gojal Alam Khan briefing the Assistant Commissioner of Hunza near the site of the collapsed bridge. Photon: HN<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><strong>Our Correspondent<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>Gulmit, February 15:<\/strong> The Assistant Commissioner of Hunza has said that the contractor responsible for construction of a wooden bridge between Shishkat and Gulmit will not be paid, because &#8220;he had not worked according to the plan&#8221;. He made the statement today while visiting the site of the collapsed bridge along with relevant officials.<\/p>\n<p style=\"text-align: justify;\">PWD official present at the occasion said that the region is not suitable for construction of another bridge.<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/Gojal-Bridge.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-39772\" alt=\"Gojal Bridge\" src=\"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/Gojal-Bridge-600x153.jpg?resize=600%2C153\" width=\"600\" height=\"153\" srcset=\"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/Gojal-Bridge.jpg?resize=600%2C153&amp;ssl=1 600w, https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/Gojal-Bridge.jpg?resize=450%2C115&amp;ssl=1 450w, https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/Gojal-Bridge.jpg?w=2000&amp;ssl=1 2000w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">The bridge had been inaugurated on 31st December 2013 and it tilted dangerously six days after its inauguration. The bridge completely collapsed yesterday, leaving the two villages disconnected.<\/p>\n<p style=\"text-align: justify;\">There are reports that the contractor had claimed up to 1.5 million rupees for construction of the bridge. However, this could not be verified from official sources.<\/p>","protected":false},"excerpt":{"rendered":"<p>Our Correspondent Gulmit, February 15: The Assistant Commissioner of Hunza has said that the contractor responsible for construction of a wooden bridge between Shishkat and Gulmit will not be paid, because &#8220;he had not worked according to the plan&#8221;. He made the statement today while visiting the site of the collapsed bridge along with relevant &hellip;<\/p>","protected":false},"author":1,"featured_media":39767,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_forum_subforum_count":0,"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[56],"tags":[],"class_list":["post-39766","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gilgit-baltistan"],"better_featured_image":{"id":39767,"alt_text":"","caption":"Tehsildar Gojal Alam Khan briefing the Assistant Commissioner near the site of the collapsed bridge ","description":"","media_type":"image","media_details":{"width":534,"height":330,"file":"2014\/02\/tehsildar.jpg","sizes":{"thumbnail":{"file":"tehsildar-260x250.jpg","width":260,"height":250,"mime-type":"image\/jpeg","source_url":"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg?resize=260%2C250&ssl=1"},"medium":{"file":"tehsildar-450x278.jpg","width":450,"height":278,"mime-type":"image\/jpeg","source_url":"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg?fit=450%2C278&ssl=1"},"120x85":{"file":"tehsildar-120x85.jpg","width":120,"height":85,"source_url":"https:\/\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar-120x85.jpg"},"415x260":{"file":"tehsildar-415x260.jpg","width":415,"height":260,"source_url":"https:\/\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar-415x260.jpg"},"150x150":{"file":"tehsildar-150x150.jpg","width":150,"height":150,"source_url":"https:\/\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar-150x150.jpg"}},"image_meta":{"aperture":0,"credit":"","camera":"","caption":"","created_timestamp":0,"copyright":"","focal_length":0,"iso":0,"shutter_speed":0,"title":""}},"post":39766,"source_url":"https:\/\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg"},"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/pamirtimes.net\/wp-content\/uploads\/2014\/02\/tehsildar.jpg?fit=534%2C330&ssl=1","_links":{"self":[{"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/posts\/39766","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/comments?post=39766"}],"version-history":[{"count":5,"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/posts\/39766\/revisions"}],"predecessor-version":[{"id":39774,"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/posts\/39766\/revisions\/39774"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/media\/39767"}],"wp:attachment":[{"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/media?parent=39766"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/categories?post=39766"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pamirtimes.net\/tg\/wp-json\/wp\/v2\/tags?post=39766"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}